Transforming PTP for Higher Throughput and Quality
Optimize. Enhance. Deliver.
Eliminating bottlenecks and upgrading core systems to achieve consistent throughput, improved yield, and stable process performance.
Consolidated activity Gantt chart tracking PTP 2.0 project progress, timelines, and execution milestones
Complete Activity Chart
0.62
SPI-Schedule Performance Index
Note : SPI = 1 (OK) if SPI less than 1 (Behind Schedule) if SPI More than 1 (Good - Ahead of Schedule)
Avg % Completion for Vendor / Contractual Activity
59.2%
Tipping Line
85%
Butts Line
75%
Thrushing (4 stages)
73%
NTRM + LRD+ Final Packing
45%
SRD + Stem complex
60%
Utility
40%
Electricals
70%
Avg % Completion for Inhouse Activity
64.7%
Minutes of Meeting for the day
Constructive team engagement and timely decisions are enabling consistent progress toward achieving planned project completion targets.
Tipps Line
Optimizing tipping and initial material handling for smooth flow, reduced losses, and consistent feed quality.
Butts Line
Enhancing butts processing efficiency through improved cylinder design, separation systems, and uniform material flow.
Thrushing
Upgrading threshing capacity with advanced design to achieve higher throughput, better recovery, and process stability.
SRD & Stem complex
Improving stem drying efficiency and process control through optimized equipment layout and enhanced automation integration.
LRD & Packing
Strengthening lamina drying and packing systems to ensure quality consistency, higher output, and reliable operations.
Utility
Ensuring robust utility support including air, power, and steam systems for uninterrupted and efficient plant performance.
Electricals
Comprehensive electrical works including cabling, panels, load distribution, and commissioning
General
Driving hygiene, 5S discipline, and deep cleaning to build a safer, efficient shopfloor.
